At Kingsbridge Hospital they required another steam boiler for redundancy with a clean steam generator packaged plantroom. This design included a partition wall in the middle and associated stab pipework connections external to container walls.
Bespoke containerised plantroom housing a 2,000kg/h Cochran Wee Chieftain, including a custom hotwell with all connections required, chemical dosing housed external to plantroom, control panel, louvred grilles on hinges to allow access to sight glasses and for yearly insurance inspections and twin wall stainless flue. Delivered and commissioned at Peel on the Isle of Man
Installation of new 2,000kg/h Cochran Wee Chieftain, complete with new Gas meters, Steam Manifold and Hotwell Tank lagged and cladded Burner Upgrade on Existing Wee Chieftain as well as remodel of existing boilerhouse pipework to suit GCBS Hire Boiler which provided steam to site while boiler was offline