West Pharma

West Pharma

Uncategorized
Problem TBC. Solution TBC. Burner Summary Rating: TBC Fuel: TBC Manufacturer: TBC Working Pressure: TBC Operation: TBC Year: TBC
Read More
NUTRICIA (DANONE)

NUTRICIA (DANONE)

Uncategorized
Problem The client required a new boiler to meet their operational requirements. Solution We decided to install a Cochran Thermax which met the client’s specification. This proved to be the most cost effective option. Burner Summary Name: Cochran Thermax Output: 15,880 KG/HR Working pressure: 17 Bar G Fuel: Dual fuel Saacke burner
Read More
FOYLE PROTEINS

FOYLE PROTEINS

Uncategorized
Problem To repair and replace the steam boilers refractory due to general usage erosion. Works carried out Brickwork and Refractory Repairs on Thermal Oxidiser and waste heat steam boiler. Service Ongoing regular repairs during annual shutdown.
Read More
HUHTAMAKI

HUHTAMAKI

Uncategorized
Problem To reduce future cost by installation of a smaller more efficient boiler saving 6% of annual fuel costs. Solution A complete new installation of a Cochran Thermax package steam boiler with economism and a service contract to maintain the boiler and equipment including the existing Thermax boiler for a period of 5 years. Solution A complete new installation of a Cochran Thermax package steam boiler with economism and a service contract to maintain the boiler and equipment including the existing Thermax boiler for a period of 5 years. Service contract (5 year) To provide services of an experienced boiler operator to attend to the boiler and equipment in the boiler house to PM5 recommendation. To include refractory replacement and ultrasonic testing when required and also be responsible for all…
Read More