KNOCKBRACKEN HEALTH CARE

Projects
[metaslider id=362] ProblemThe boilers needed to be installed over 200 metres of grass without the ground being disturbed. Knockbracken health care had two steam boilers which were proving to be inefficient and costly to repair. Solution A crane and truck with a lift was hired along with treaded matts to place along the grass in order to transport the boiler without damaging the premises. The two inefficient boilers were replaced with a more efficient Cochran boiler which can burn both Oil and Gas. Burner Summary Output: 2000 KG/HR Fuel: Natural Gas and Oil Working Pressure: 10 Bar G Type: Simplex Pressure Jet Combustion Control: High / Low Turn Down Ratio: 2:1
Read More
BALLYRASHANE CREAMERY

BALLYRASHANE CREAMERY

Projects
Problem The Creamery wanted to change to Natural Gas because it became available. This allowed the client to greatly reduce their fuel bills. Solution The main goal of this installation was to reduce the overall cost of fuel. This was done by installing Dual Fuel Burners oil and Gas with Electronic controls and variable speed fans. The boilers come fitted with flue gas economisers and Auto blowdown and Tds blowdown which should increase the boilers efficiency by 5 – 7%. Burner Summary Output: 2 x 5000 KG/HR Fuel: Natural Gas and Oil Working Pressure: 10 Bar G
Read More