KNOCKBRACKEN HEALTH CARE

ProblemThe boilers needed to be installed over 200 metres of grass without the ground being disturbed. Knockbracken health care had two steam boilers which were proving to be inefficient and costly to repair. Solution A crane and…

BALLYRASHANE CREAMERY

Problem The Creamery wanted to change to Natural Gas because it became available. This allowed the client to greatly reduce their fuel bills. Solution The main goal of this installation was to reduce the overall cost of fuel. This was done…

Dale Farm Tank Removal

Some images of the removal of an oil tank at Dalefarm Cookstown.