West Pharma

West Pharma

Problem TBC. Solution TBC. Burner Summary Rating: TBC Fuel: TBC Manufacturer: TBC Working Pressure: TBC Operation: TBC Year: TBC
Read More
NUTRICIA (DANONE)

NUTRICIA (DANONE)

Problem The client required a new boiler to meet their operational requirements. Solution We decided to install a Cochran Thermax which met the client’s specification. This proved to be the most cost effective option. Burner Summary Name: Cochran Thermax Output: 15,880 KG/HR Working pressure: 17 Bar G Fuel: Dual fuel Saacke burner
Read More
FOYLE PROTEINS

FOYLE PROTEINS

Problem To repair and replace the steam boilers refractory due to general usage erosion. Works carried out Brickwork and Refractory Repairs on Thermal Oxidiser and waste heat steam boiler. Service Ongoing regular repairs during annual shutdown.
Read More